Our mission at EON is to make every decision with the highest level of integrity, both in quality of product, and in service. We adhere to the highest standards of commercial design and siding. Taking every opportunity to go the extra mile for our partners and clients.
Bringing design concepts to completion with excellence and distinction. As a proven leader in commercial exterior siding, EON Construction brings together outstanding service matched with high-quality materials. Our collaborative approach, attention to detail, and commitment to excellence sets our work apart.







MASERATI
Brighton, MA, September 2019
We worked with the CM&B Team and Classic Exteriors on this four-week commercial siding project. Applying a ACM Spline System, we constructed the siding on approximately 4,000 Square Feet of commercial siding for a new addition to the previous structure of the Maserati dealership. The GM needed EON Construction to complete the job with a fast turnaround time. We were able to do so.
10 ESSEX ST
Central Square, Cambridge, October 2018 to July 2019
EON Construction started the 80K square foot commercial siding project with Z-furring and 3-inches of foam insulation. Then we strapped the building and added the Hardie Fiber Cement Panels with a riglet system. The design called for fastening the siding with color matched nails, which added a nice touch. The project was completed on time.
MERRIMACK COLLEGE MEDICAL CENTER
North Andover, MA. October to November, 2019 - 5 weeks.
The unique architectural shape of the building structure, with varying panel dimensions, and sharp design corners of the 65000sqft project made for a visually inspiring design. Out team was brought in to install the ACM panel rainscreen system. This was another job that we secured when it was behind schedule and helped the project reach completion on time.
295 Washington St. Whitman, Massachusetts, 02382